Skip to content

Talon Robotics

Menu
  • Team
    • Structure
    • History
  • Sponsors
    • 2024-25 Sponsors
    • Become a Sponsor
  • Outreach
    • FIRST Tech Challenge
    • FIRST Lego League
    • Demos
  • Events
    • FRC Calendar
    • FTC Calendar
    • Upcoming Events
  • Resources
    • Incident Report Form
    • Team Registration
    • Member Login
    • Mentor Sign Up
    • Monday Meal Donations
    • Frequently Asked Questions
    • Lettering Requirements
    • Talking Points
    • Core Values
    • Code of Conduct
    • Team Handbook
  • Blog
    • 2025 Build Season
    • 2025 Offseason
    • Past Blog Posts

Category: Blog

Day 38 – Parts! (2/10/2020)

February 11, 2020 Author: Andrew Georgioff Category: 2020 Build Season

Authors: Ritik Mishra, Andrew Georgioff Parts Arrived! Today, we got a gigantic load of parts back from CEM. These include: Most of the hopper ribs Most of the shooter superstructure The shooter flywheel weight! Above: Two of our four 02 – 07 Flywheel Weights, assembled onto versahubs. Look how pretty…

read more

Day 37 – Bumpers and Bumper Usage (2/09/2020)

February 9, 2020 Author: Andrew Georgioff Category: 2020 Build Season

Authors: Andrew Georgioff, Ritik Mishra Driver’s Test Today, we had the Driver’s Test. The driver’s test consists of two parts: a written, multiple choice test focused on the rules in the game manual, team updates since kickoff, and important Q&A questions; and a driving test, which involves precisely following an…

read more

Day 38 – Climber is finally CADded (2/08/2020)

February 9, 2020 Author: Andrew Georgioff Category: 2020 Build Season

Authors: Andrew Georgioff, Ritik Mishra, Ishan Shetty Field Elements All of the remaining field elements were brought in today, allowing us to build a half-field. Once they were brought in, multiple members quickly began painting them. After this, we set up the field for tomorrow’s driving test.  Above: team members…

read more

Day 34 – Airpods.SLDPRT received (2/06/2020)

February 8, 2020 Author: Andrew Georgioff Category: 2020 Build Season

Authors: Andrew Georgioff, Ritik Mishra Active Intake Parts Parts were brought in the room today by one of our members who cut them with a waterjet. There were originally more holes in the design for weight-saving purposes, but he had to remove them as they increased the cut time by…

read more

Day 32 – 3D Printer Setup (2/04/2020)

February 5, 2020 Author: Andrew Georgioff Category: 2020 Build Season

Authors: Andrew Georgioff, Ritik Mishra 3D Printer We were taught how to operate our new Stratasys 3D printer by a Stratasys employee. We received the printer from Stratasys on the 27th. A basic set of rules was also determined for the 3d printer to ensure proper usage. The two main…

read more

Day 30 – Sent CADs (02/02/2020)

February 4, 2020 Author: Andrew Georgioff Category: 2020 Build Season

Authors: Andrew Georgioff, Ritik Mishra Flywheel Testing We tested the flywheel today to get some final measurements on how much compression is ideal for maximum power. Through this testing, we decided to set the compression to 1.5 inches for now. CAD Drawings Today, we finished CAD & technical drawings for…

read more

Day 28 – Intake Prototype and Code Stuffs (1/31/2020)

February 1, 2020 Author: Andrew Georgioff Category: 2020 Build Season

Authors: Ritik Mishra Intake Prototype Today, we tested a new intake design. This design is meant to truly intake the ball over the bumper, as opposed to intaking it over a frame cutout. The design has 3 rubber rollers arranged to guide the ball up and over the bumper without…

read more

Day 27 – Code and Hopper (1/30/2020)

January 31, 2020 Author: Andrew Georgioff Category: 2020 Build Season

Authors: Andrew Georgioff, Ishan Shetty, Ritik Mishra Robot Code The robot code is also being worked on currently so that the robot is programmatically ready for driver’s tests in a couple of days. Currently, the rookies are being helped with making different subsystems on the robot. These subsystems include intake,…

read more

Day 25 – CAD, CAD, and more CAD (1/28/2020)

January 28, 2020 Author: Andrew Georgioff Category: 2020 Build Season

Authors: Andrew Georgioff Today was a quieter day, with mostly meetings and CAD occurring. There were programming and summer camps meetings, as well as a team meeting, though many members spent the day finalizing CAD drawings to be sent to CEM. Summer Camps Meeting There was another meeting to discuss…

read more

Day 24 – The Return of the SOLIDWORKS (1/27/2020)

January 27, 2020 Author: Andrew Georgioff Category: 2020 Build Season

Authors: Andrew Georgioff, Danny Georgioff,  Intro Today was a CAD day as we are aiming to send CAD to CEM tomorrow. Printer Today, we got a printer donated from Stratasys! We are currently working with Stratasys to set up a training session and get it fully set up with materials,…

read more

Posts navigation

Older posts
Newer posts

Recent Blog Posts

  • Our Second Offseason Open Room!
  • Our First Summer Open Room!
  • 2025 STEM Day: Kicking off Our Offseason!
  • A Year of Change: Goodbye to Reefscape
  • 2025 Season Outreach Summary

Stay Connected With Us!

Copyright © 2025 Talon Robotics. All Rights Reserved.
Screenr parallax theme by FameThemes