Skip to content

Talon Robotics

Menu
  • Team
    • Structure
    • History
    • Meet The Team
  • Sponsors
    • 2024-25 Sponsors
    • Become a Sponsor
  • Outreach
    • FIRST Tech Challenge
    • FIRST Lego League
    • Demos
  • Events
    • Calendar
    • Upcoming Events
  • Resources
    • Incident Report Form
    • Team Registration
    • Member Login
    • Mentor Sign Up
    • Monday Meal Donations
    • Frequently Asked Questions
    • Lettering Requirements
    • Talking Points
    • Core Values
    • Code of Conduct
    • Team Handbook
  • Blog
    • 2025 Build Season
    • 2024 Offseason
    • 2024 Build Season
    • 2023 Offseason
    • 2023 Build Season
    • 2022 Offseason
    • 2022 Build Season
    • 2021 Offseason
    • 2021 Build Season
    • 2020 Offseason
    • 2020 Build Season
    • 2018 Build Season
    • 2017 Build Season

Category: 2020 Build Season

Day 30 – Sent CADs (02/02/2020)

February 4, 2020 Author: Andrew Georgioff Category: 2020 Build Season

Authors: Andrew Georgioff, Ritik Mishra Flywheel Testing We tested the flywheel today to get some final measurements on how much compression is ideal for maximum power. Through this testing, we decided to set the compression to 1.5 inches for now. CAD Drawings Today, we finished CAD & technical drawings for…

read more

Day 28 – Intake Prototype and Code Stuffs (1/31/2020)

February 1, 2020 Author: Andrew Georgioff Category: 2020 Build Season

Authors: Ritik Mishra Intake Prototype Today, we tested a new intake design. This design is meant to truly intake the ball over the bumper, as opposed to intaking it over a frame cutout. The design has 3 rubber rollers arranged to guide the ball up and over the bumper without…

read more

Day 27 – Code and Hopper (1/30/2020)

January 31, 2020 Author: Andrew Georgioff Category: 2020 Build Season

Authors: Andrew Georgioff, Ishan Shetty, Ritik Mishra Robot Code The robot code is also being worked on currently so that the robot is programmatically ready for driver’s tests in a couple of days. Currently, the rookies are being helped with making different subsystems on the robot. These subsystems include intake,…

read more

Day 25 – CAD, CAD, and more CAD (1/28/2020)

January 28, 2020 Author: Andrew Georgioff Category: 2020 Build Season

Authors: Andrew Georgioff Today was a quieter day, with mostly meetings and CAD occurring. There were programming and summer camps meetings, as well as a team meeting, though many members spent the day finalizing CAD drawings to be sent to CEM. Summer Camps Meeting There was another meeting to discuss…

read more

Day 24 – The Return of the SOLIDWORKS (1/27/2020)

January 27, 2020 Author: Andrew Georgioff Category: 2020 Build Season

Authors: Andrew Georgioff, Danny Georgioff,  Intro Today was a CAD day as we are aiming to send CAD to CEM tomorrow. Printer Today, we got a printer donated from Stratasys! We are currently working with Stratasys to set up a training session and get it fully set up with materials,…

read more

Day 23 – Wheel Selection (1/26/2020)

January 27, 2020 Author: Andrew Georgioff Category: 2020 Build Season

Authors: Ritik Mishra, Andrew Georgioff Wheel of Fortune The completed Control Panel/Wheel of Fortune was brought in today. This allowed us to clearly see how much space you had when driving underneath it. In the future, this will allow us to test mechanisms and code for completing the control panel…

read more

Day 22 – Wheels Down! (1/25/2020)

January 26, 2020 Author: Andrew Georgioff Category: 2020 Build Season

Authors: Andrew Georgioff, Ritik Mishra Climbing We received and assembled the generator switch (climbing bar) using ladders as temporary supports. This allowed us to more realistically test the climber and roughly test the effect of spacing and weight on the switch angle. Through this testing, we determined that it should…

read more

Day 21 – Vision Returns (01/24/2020)

January 24, 2020 Author: Andrew Georgioff Category: 2020 Build Season

Authors: Ishan Shetty, Andrew Georgioff, Ritik Mishra, Ravisha Jaiswal Vision Today, the programmers spent some effort making the Limelight work on Sergeant Sammy. After getting familiar with both the 2020 version of WPILib (there are several important differences that impeded progress) and the example code provided in the Limelight documentation,…

read more

Day 20 – Cleanup (1/23/2020)

January 23, 2020 Author: Andrew Georgioff Category: 2020 Build Season

Authors: Andrew Georgioff, Ritik Mishra Intro Today, less things happened in the room because it ended at 5:30pm instead of 9pm, not that there was a lot to do anyways. We are still waiting on drivetrain spacers before we can finish assembling the gearboxes onto the frame. We are currently…

read more

Day 18 – Flywheel Selection (1/21/2020)

January 21, 2020 Author: Andrew Georgioff Category: 2020 Build Season

Authors: Andrew Georgioff, Ritik Mishra Introduction On Friday, we did not have open room because of really bad weather. The school day ended two hours earlier, allowing us to spend more time working in Solidworks on robot design.  On Saturday, the FTC teams that we mentor at the local middle…

read more

Posts navigation

Older posts
Newer posts

Recent Blog Posts

  • 2025 Build Season Days 38-45 (2/9-2/16)
  • 2025 Build Season Days 17-24 (1/20-1/26)
  • 2025 Build Season Days 9-16 (1/13-1/19)
  • Happy Holidays❄️⛄!
  • Robots & Rotini

Stay Connected With Us!

Copyright © 2025 Talon Robotics. All Rights Reserved.
Screenr parallax theme by FameThemes